Datalogic C-BOX 200 Manual de Instalação

Consulte online ou descarregue Manual de Instalação para não Datalogic C-BOX 200. Datalogic C-BOX 200 Installation manual Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir

Resumo do Conteúdo

Página 1 - C-BOX 200

C-BOX 200Installation Manual

Página 3

GENERAL FEATURES111 GENERAL FEATURES1.1 DESCRIPTIONThe C-BOX 200 is a connection box which can be used as an accessory of theDatalogic scanners to per

Página 4 - 821000561 (Rev. A)

C-BOX 200222 INSTALLATION2.1 PACKAGE CONTENTSVerify that the C-BOX 200 and all the parts supplied with the equipment are presentand intact when openin

Página 5 - CONTENTS

INSTALLATION322.2 OPENING THE DEVICETo install the C-BOX 200 or during normal maintenance, it is necessary to open it byunscrewing the four cover scr

Página 6 - GUIDE TO INSTALLATION

C-BOX 200422.3 MECHANICAL INSTALLATIONThe diagram below gives the overall dimensions of the C-BOX 200 and may be usedfor its installation.mminC-BOXFig

Página 7 - GENERAL VIEW

INSTALLATION52C-BOX 200 can be installed to operate in different positions. The two screw holesinside the housing of the C-BOX 200 are for mechanical

Página 8

C-BOX 200622.4 ELECTRICAL CONNECTIONS AND SETUPThe following figure shows the typical layout. The dotted line in the figure refers to anoptional hard

Página 9 - SAFETY PRECAUTIONS

INSTALLATION722.4.1 Power SupplyPower is supplied to the C-BOX 200 through the pins provided on the spring clampconnector.The power switch (see Figure

Página 10

C-BOX 200822.4.2 System WiringThe connection and wiring procedure for C-BOX 200 is described as follows:1) Open the C-BOX 200 as described in paragra

Página 11 - 1 GENERAL FEATURES

INSTALLATION92The C-BOX 200 spring clamp connector pinouts are indicated in the following table.Refer to the scanner Installation Manual for details.P

Página 12 - 2 INSTALLATION

C-BOX 200Installation Manual

Página 13 - 2.2 OPENING THE DEVICE

C-BOX 2001022.4.3 Chassis Grounding Jumper SettingsThe scanner chassis grounding method can be selected by positioning a jumper (seeFigure 9). In thi

Página 14 - 2.3 MECHANICAL INSTALLATION

INSTALLATION1122.4.4 Multidrop Address SelectionFor RS485 half-duplex interface connections, the scanner multidrop address shouldbe set using the rota

Página 15 - Figure 4 - Mounting C-BOX 200

C-BOX 2001222.4.5 RS485 Bus TerminationONS2OFFFigure 11 - Termination resistance switchThe switch S2 enables or disables the insertion of the bus ter

Página 16 - Scanner

INSTALLATION1322.4.6 Connection to a MultiplexerThe following figure shows a multidrop layout with C-BOX 200 devices connected toa Multiplexer:MULTIP

Página 17 - 2.4.1 Power Supply

C-BOX 2001422.4.7 OM4000 Jumper SettingsJ1 J2Figure 13 - OM4000 jumpersThe jumpers allow connection to the EXT TRIG signals on separate spring clampt

Página 18 - 2.4.2 System Wiring

INSTALLATION1522.5 9-PIN SCANNER AUXILIARY SERIAL INTERFACEThe scanner auxiliary serial interface available on the internal 9-pin connector can beuse

Página 19

C-BOX 2001622.6 SCANNER REQUIREMENTS1) The C-BOX 200 can be connected to the following scanners through the 25-pinconnector illustrated in Figure A.D

Página 20

INSTALLATION1722.7.1 GET/SEND ButtonsThe C-BOX 200 has two internal function buttons (GET, SEND). The procedure toenable the GET/SEND function is the

Página 21 - Figure 10 - Rotary switches

C-BOX 2001822.7.2 LED IndicatorsPower onWarningTxFigure 15 - LED IndicatorsThe three internal LEDs of the C-BOX 200 (see Figure 15) indicate the follo

Página 22 - 2.4.5 RS485 Bus Termination

TECHNICAL FEATURES1933 TECHNICAL FEATURESELECTRICAL FEATURESPowerSupply voltage 10 to 30 VdcPower consumption max. 1.4 W + scannerUSER INTERFACELED

Página 23

C-BOX 200INSTALLATION MANUAL

Página 24 - 2.4.7 OM4000 Jumper Settings

01DATALOGIC S.p.A.,Via Candini, 240012 - Lippo di CalderaraBologna - Italydichiara chedeclares that thedéclare que lebescheinigt, daß das Gerätdeclar

Página 25

DATALOGIC S.p.A.Via Candini 240012 - Lippo di Calderara di RenoBologna - ItalyC-BOX 200Ed.: 01/2002ALL RIGHTS RESERVEDDatalogic S.p.A. reserves the ri

Página 26 - 2.7 OPERATING MODES

iiiCONTENTSGUIDE TO INSTALLATION ...ivGENERAL VIEW ...

Página 27 - 2.7.1 GET/SEND Buttons

ivGUIDE TO INSTALLATIONThe following can be used as a checklist to verify all of the steps necessary forcomplete installation of the C-BOX 200.1) Rea

Página 28 - 2.7.2 LED Indicators

vGENERAL VIEWC-BOX 200123Figure A25-pin scanner connectorCover screws (4)Compression connectors123

Página 29 - 3 TECHNICAL FEATURES

viC-BOX 20041012 67 8 9 125311Figure BPower switch (ON/OFF)12Spring clamp terminal blocks3Multidrop address switches54Power on LEDWarning LED6Tx LED7G

Página 30

viiSAFETY PRECAUTIONSPOWER SUPPLYATTENTION: READ THIS INFORMATION BEFORE INSTALLING THE PRODUCT- This product is intended to be installed by Qualified

Comentários a estes Manuais

Sem comentários